Soil remediation project of a former manufactured coal gas plant in Nanjing

发布时间:2021-8-18   浏览量:

One of the largest high temperature ISTDprojects in China
Scale of TTZ: area - 12196m2, volume - 67138m3, max. depth-12m bgs;
COCs: BTEX, PAHs, etc;
Remediation Time-frame:2018-2021;
Remediation Effect: 100% met RG, min. COCs removal rate 99.7%.

COCs

RG (mg/kg)

Benzene

0.64

Benzo (a) anthracene

0.634

Benzo (a) pyrene

0.466

Phenylalanine (b) fluoranthene

0.636